Will we really be ready to move in next weekend? It's a little hard to believe when you consider these pics. The inside is coming along a little better than the outside, primarily because of rain today. The outside pic here was taken this morning (those are the septic drain lines). Supposedly those were all covered today before the rain set in, but I didn't go out there again because I figured it was a mud pit.

The kitchen and tile pics are from earlier in the week. The tile has been grouted, and the granite countertops were installed today! It killed me not to rush out there to see them.

There still seems to be too much to do for the time we have. Outside, the water lines have to be run from the road to the house. The footers have to be poured for the retaining wall and front porch. Then those have to be built. Then there is some final grading, and the concrete poured for driveway, sidewalk, and porch.

Inside, the electricians were out there today, so that may be nearing completion. They had a few more fixtures to install and lots of finishing up to do. The plumbing fixtures still have to be installed and the water lines run. The trim still wasn't finished by this morning, and a couple of the interior doors weren't installed yet. The painters still need to come back and paint those plus touch up all their work. The closet organizers still all need to be installed. And finally, the fireplace insert and mantle haven't even been begun. Talk about waiting till the last minute!

I think Brad is still hoping that the interior is mostly done by the end of the week so that we can get in there over the weekend and clean up some. I don't think that's gonna happen though. Even if it is pretty much finished, I won't really have time to be there much since I'm going out of town for three days.

I WILL be out there tomorrow morning, so I'll try to post again before the weekend to let you guys know the update. Stay tuned...